The city of Mulvane, Kan., recently awarded the joint venture team Burns & McDonnell/CAS, LLC a contract to design and build Phase I of the Mulvane wastewater treatment plant improvements. Following a series of studies performed by Burns & McDonnell in spring 2011, the city gained funding to construct facilities to handle wastewater flow from a new casino development. This phase of improvements includes primary treatment — screening, grit and grease removal, and equalization — of the casino development flow; expanded aeration capacity; a selector basin for improved biological nitrogen removal; and chemical feed facilities along the pipeline route. Phase 1 was scheduled to be completed by mid-December 2011.
-
Services
- Air Quality Control
- Architecture
- Aviation
- Business Consulting
- Construction
- Electrical Transmission & Distribution
- Energy Services
- Environmental
- Environmental Studies & Permitting
- Facilities Design
- Healthcare & Research Facilities
- Industrial
- Information Technology
- Laboratories & Clean Rooms
- Power Generation
- Process Design
- Program Management
- Security
- Sustainability
- Telecommunications
- Transportation
- Water
- Our Differences
- Company
- Resources
- News
- Careers

