Wastewater Projects

Chemical Processing Facility
Location: Hurst, Texas
Client: Bell Helicopter Textron Inc.
Description: 

Design services for the construction of a new 40,000-square-foot facility with two automated chemical processing lines for Bell Helicopter Textron Inc., Hurst, Texas.

Gracemore Relief Sewer Design
Location: Kansas City, Mo.
Client: Kansas City, Mo.
Description: 

Infiltration and inflow study of the Shoal Creek drainage basin for the City of Kansas City, Mo., encompassing over 450,000 feet of 8- through 54-inch sewer and recommend improvements to reduce wet weather deficiencies.

Sanitary Sewer Facilities Plan
Location: Pierre, S.D.
Client: Pierre, S.D.
Description: 

Evaluation of the existing sewage collection and treatment system and preparation of a 30-year master plan for improvements for the City of Pierre, S.D.

Joint Waste Disposal Force Main and Sludge Transfer Stations
Location: Elgin, Ill.
Client: City of Elgin and Fox River Water Reclamation District
Description: 

Design and construction of sludge disposal main and transfer main for the City of Elgin, Ill., and the Fox River Water Reclamation District.

CSO Long Term Control Plan
Location: Atchison, Kan.
Client: Atchison, Kan.
Description: 

Developed a long-term control plan that details the steps necessary to bring Atchison’s combined sewer system into compliance with the federal Combined Sewer Overflow (CSO) policy.

Missouri River Treatment Plant Solids Handling
Location: Maryland Heights, Mo.
Client: Metropolitan St. Louis Sewer District
Description: 

Performing comprehensive wastewater treatment facilities master planning and design for improvements to the Metropolitan St. Louis Sewer District Missouri River Treatment Plant near Maryland Heights, Mo.

Cooper Creek Wastewater Treatment Facility
Location: Branson, Mo.
Client: City of Branson
Description: 

A new 3 million gallon per day (MGD) advanced wastewater treatment plant, including major interceptor sewers to collect flows and convey wastewater to the new plant. Also, development of a financing plan to support the new facilities.

Dulces Nombres Wastewater Treatment Plant
Location: Monterrey, Mexico
Client: Desarrollo y Construcciones Urbanas SA (DYCUSA)
Description: 

Design and construction of the Dulces Nombres Wastewater Treatment Plant in Monterrey, Mexico.

Manufacturing & Plating Facility Consolidation
Location: Grand Prairie, Texas
Client: Bell Helicopter Textron Inc.
Description: 

Design services for the development of capital budgets for the construction of a new 96,000-square-foot manufacturing facility with nine automated and three manual metal finishing lines for Bell Helicopter Textron Inc., Grand Prairie, Texas.

Overflow Control Program
Location: St. Louis
Client: Metropolitan St. Louis Sewer District
Description: 

Three-phase development of a system improvement plan for the separate sanitary sewer systems that serve 1.1 million people in the St. Louis metropolitan area.

Water & Wastewater Master Plan
Location: Raymore, Mo.
Client: Raymore, Mo.
Description: 

Development of master plan documents and a capital improvement program to meet current and future needs for the water supply and distribution and the wastewater collection and conveyance systems in the City of Raymore, Mo.

Missouri River Treatment Plant Improvements
Location: Maryland Heights, Mo.
Client: Metropolitan St. Louis Sewer District
Description: 

Performing comprehensive wastewater treatment facilities master planning and design for improvements to the Metropolitan St. Louis Sewer District's Missouri River Treatment Plant near Maryland Heights, Mo.

Regional Wastewater Conveyance System & Treatment Plant
Location: Washington and Benton counties, Ark.
Client: Northwest Arkansas Conservation Authority
Description: 

Engineering services for the planning and design of a new regional wastewater conveyance system and treatment plant for the Northwest Arkansas Conservation Authority (NACA) serving 10 cities in northwest Arkansas.

Cabot Wastewater Treatment Plant
Location: Cabot, Ark.
Client: City of Cabot, Ark.
Description: 

Design of improvements to wastewater treatment facilities in the City of Cabot, Ark., including a new influent pump station with submersible pumps, a pair of fine screens, an oxidation ditch capable of nitrogen removal, two final clarifiers with rapid sludge removal and an ultraviolet disinfection system.

Overflow Control Program Assistance
Location: Kansas City, Mo.
Client: City of Kansas City, Water Services Department
Description: 

Program assistance for implementation of Kansas City's $2.5 billion long-term overflow control plan, which addresses overflows within the sanitary and combined sewer systems over a 25-year period.

Bee Creek Wastewater Collection System
Location: Branson, Mo.
Client: Branson, Mo.
Description: 

Planning and design services for the Bee Creek Wastewater Collection System, serving the 4,000 acre Bee Creek watershed just north of Branson, Mo.

Wastewater Treatment Plant Digester Upgrade
Location: Springdale, Ark.
Client: Springdale Water Utilities
Description: 

Designed improvements to two 70-foot diameter and one 80-foot diameter anaerobic digesters at the City of Springdale, Arkansas’ Wastewater Treatment Plant.

Industrial Wastewater Treatment Plant Study
Location: Lincoln, Neb.
Client: Lincoln Plating
Description: 

Concept study evaluation of an existing industrial wastewater treatment plant for expansion to increase capacity for future process plant growth for Lincoln Plating, Lincoln, Neb.