Wastewater Projects
Location: Hurst, Texas
Client: Bell Helicopter Textron Inc.
Design services for the construction of a new 40,000-square-foot facility with two automated chemical processing lines for Bell Helicopter Textron Inc., Hurst, Texas.
Location: Kansas City, Mo.
Client: Kansas City, Mo.
Infiltration and inflow study of the Shoal Creek drainage basin for the City of Kansas City, Mo., encompassing over 450,000 feet of 8- through 54-inch sewer and recommend improvements to reduce wet weather deficiencies.
Location: Pierre, S.D.
Client: Pierre, S.D.
Evaluation of the existing sewage collection and treatment system and preparation of a 30-year master plan for improvements for the City of Pierre, S.D.
Location: Elgin, Ill.
Client: City of Elgin and Fox River Water Reclamation District
Design and construction of sludge disposal main and transfer main for the City of Elgin, Ill., and the Fox River Water Reclamation District.
Location: Atchison, Kan.
Client: Atchison, Kan.
Developed a long-term control plan that details the steps necessary to bring Atchison’s combined sewer system into compliance with the federal Combined Sewer Overflow (CSO) policy.
Location: Maryland Heights, Mo.
Client: Metropolitan St. Louis Sewer District
Performing comprehensive wastewater treatment facilities master planning and design for improvements to the Metropolitan St. Louis Sewer District Missouri River Treatment Plant near Maryland Heights, Mo.
Location: Branson, Mo.
Client: City of Branson
A new 3 million gallon per day (MGD) advanced wastewater treatment plant, including major interceptor sewers to collect flows and convey wastewater to the new plant. Also, development of a financing plan to support the new facilities.
Location: Monterrey, Mexico
Client: Desarrollo y Construcciones Urbanas SA (DYCUSA)
Design and construction of the Dulces Nombres Wastewater Treatment Plant in Monterrey, Mexico.
Location: Grand Prairie, Texas
Client: Bell Helicopter Textron Inc.
Design services for the development of capital budgets for the construction of a new 96,000-square-foot manufacturing facility with nine automated and three manual metal finishing lines for Bell Helicopter Textron Inc., Grand Prairie, Texas.
Location: St. Louis
Client: Metropolitan St. Louis Sewer District
Three-phase development of a system improvement plan for the separate sanitary sewer systems that serve 1.1 million people in the St. Louis metropolitan area.
Location: Raymore, Mo.
Client: Raymore, Mo.
Development of master plan documents and a capital improvement program to meet current and future needs for the water supply and distribution and the wastewater collection and conveyance systems in the City of Raymore, Mo.
Location: Maryland Heights, Mo.
Client: Metropolitan St. Louis Sewer District
Performing comprehensive wastewater treatment facilities master planning and design for improvements to the Metropolitan St. Louis Sewer District's Missouri River Treatment Plant near Maryland Heights, Mo.
Location: Washington and Benton counties, Ark.
Client: Northwest Arkansas Conservation Authority
Engineering services for the planning and design of a new regional wastewater conveyance system and treatment plant for the Northwest Arkansas Conservation Authority (NACA) serving 10 cities in northwest Arkansas.
Location: Cabot, Ark.
Client: City of Cabot, Ark.
Design of improvements to wastewater treatment facilities in the City of Cabot, Ark., including a new influent pump station with submersible pumps, a pair of fine screens, an oxidation ditch capable of nitrogen removal, two final clarifiers with rapid sludge removal and an ultraviolet disinfection system.
Location: Kansas City, Mo.
Client: City of Kansas City, Water Services Department
Program assistance for implementation of Kansas City's $2.5 billion long-term overflow control plan, which addresses overflows within the sanitary and combined sewer systems over a 25-year period.
Location: Branson, Mo.
Client: Branson, Mo.
Planning and design services for the Bee Creek Wastewater Collection System, serving the 4,000 acre Bee Creek watershed just north of Branson, Mo.
Location: Springdale, Ark.
Client: Springdale Water Utilities
Designed improvements to two 70-foot diameter and one 80-foot diameter anaerobic digesters at the City of Springdale, Arkansas’ Wastewater Treatment Plant.
Location: Lincoln, Neb.
Client: Lincoln Plating
Concept study evaluation of an existing industrial wastewater treatment plant for expansion to increase capacity for future process plant growth for Lincoln Plating, Lincoln, Neb.
