Burns & McDonnell provided complete detailed design, procurement and construction services for the boiler replacement at a Kansas City, Kan., facility.

Services

  • Detailed engineering
  • Procurement
  • Construction management

Background

Procter & Gamble needed to replace its existing, aged boiler at its Kansas City, Kansas, manufacturing facility. Burns & McDonnell located the new boilers, two 70,000 pounds/hour, 150 psig units, in a vacated area and tied them into the existing steam and condensate heater system. One boiler was fired with natural gas, and the other ran on dual fuel — natural gas with fuel oil back-up.

Burns and McDonnell performed detailed design in the process, mechanical/piping, civil/structural/architectural, electrical/instrumentation and controls disciplines. Deliverables included layouts, piping routing, boiler and feedwater system specifications, building specifications, foundation design, electrical design and tie-in designations. Burns & McDonnell purchased all equipment for this project.

Burns & McDonnell managed and subcontracted the new facility construction with no lost-time or recordable incidents and also provided commissioning, startup and training assistance for the new boilers.

Features

  • Completed project with only 2 percent change from the original bid
  • Performed facility construction with no lost-time or recordable incidents
insignia

Send Us a Note

Warren Kennedy Senior Vice President 832-214-1200
*Denotes Required Field
Burns & McDonnell needs the contact information you provide to us to contact you about our products and services. You may unsubscribe from these communications at anytime. For information on how to unsubscribe, as well as our privacy practices and commitment to protecting your privacy, check out our Privacy Policy.