On-Call Architecture & Engineering - Jefferson City, Missouri

Client: City of Jefferson City, Missouri
Completion Date: Ongoing: 2005-present
Location: Jefferson City Memorial Airport, Missouri

Summary

Burns & McDonnell has provided planning, design and construction phase services for the Jefferson City Memorial Airport under five-year on-call contracts since 2005. The projects have included:

  • Design for the rehabilitation of Runway 12-30
  • New airfield lighting control system
  • Construction of a full parallel Taxiway A
  • Design of the full parallel Taxiway B for Runway 9-27
  • Geometric improvements for the existing apron
  • New medium intensity taxiway lights (MITLs)
  • Electrical vault upgrades
  • Field surveys
  • Update of the airport capital improvement plan (ACIP) data sheets
  • Airport master plan update

Services

  • Planning, engineering and construction phase services
  • Taxiway A and taxiway connectors
  • Taxiway B and taxiway connectors
  • 405 surveys for Runway 12-30
  • Apron geometric improvements
  • Airport master plan
  • ACIP annual updates
insignia