The project team employed a highly integrated design and construction methodology, leveraging advanced 3D building information modeling (BIM) to coordinate complex equipment-to-building interfaces and streamline project execution. Close collaboration among architectural, engineering and process design teams enabled the successful navigation of challenging site conditions, rigorous safety requirements and budget constraints while maintaining schedule.