High-Priority Inflow & Infiltration Reduction Program

Our team is executing a program to reduce inflow and infiltration (I/I) under a consent decree for the Hampton Roads Sanitation District (HRSD). The program is being implemented under a progressive design-build (PDB) delivery model from planning through construction. This marks the first time a single entity is responsible for identifying, remediating and tracking I/I performance to meet regulatory compliance requirements for an EPA-issued consent decree of this type using real-time data, hydraulic modeling and phased construction.

We are responsible for assessing, planning, inspecting, designing and constructing I/I remediation projects to achieve cost-effective sanitary sewer overflow (SSO) volume reduction. The program spans multiple jurisdictions and aims to significantly reduce excess wet weather flows contributing to SSOs.

Our flexible, data-driven delivery model combines real-time flow and rainfall data analytics to prioritize and focus proposed improvements. We are using comprehensive sanitary sewer evaluation survey (SSES) field work and mini-basin hydraulic modeling to develop actionable, right-sized rehabilitation packages for construction. Over the first 12 months of the program, only one of the initial 19 priority basins were determined to require work that would be cost-effective. We have identified other priority basins where we will be able to achieve meaningful and cost-effective SSO reductions, providing strategic alignment with HRSD and helping optimize its investment.

As the project has moved into construction, the ability to engage local, regional and national subcontractors has resulted in significant cost savings. As construction progresses, we will engage local contractors in support of the cost analysis to historical averages by reducing layers to the targeted subcontractors doing the actual work. The team has prioritized basin improvements based on available data, local permitting and strategic delivery of the construction efforts. By structuring the work into phased, locality-specific packages, efficiency is optimized, disruption is minimized, and continuous performance validation is allowed.

The PDB model has enabled prioritized construction starts in areas of the greatest SSO volume reduction impacts and avoided areas where investment would have not obtained desired results or value to HRSD rate payer. The team is applying decades of experience in collaborative delivery and I/I mitigation to help HRSD achieve measurable environmental benefits while optimizing capital investments.

Client

Hampton Roads Sanitation District

Location

Hampton Roads, Virginia

Region

Mid-Atlantic

Services

Wastewater & Stormwater Collection

Inflow & Infiltration Reduction

Construction

Project Delivery

Industries

Water

Environmental

Construction